蘇花改隧道13日起火警測試


Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272
0

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

Warning: mysqli_real_connect(): (08004/1040): Too many connections in /var/www/html/wp-content/db.php on line 1272

 記者林坤瑋/宜蘭報導
 公路總局第四區養護工程處將於十三日起至廿一日期間進行台九線蘇花改隧道火警設備功能測試,測試時段將實施道路(隧道)管制封閉,各隧道測試及封閉日期及時段序列如下:
 一、觀音谷風隧道十三、十四日及二十日共計三日,於當日夜間二十時至廿四時管制封閉。二、中仁隧道十六日夜間二十時至廿四時管制封閉。三、仁水隧道廿一日夜間二十時至廿四時管制封閉。
 四工處表示,本案係為蘇花改隧道消防設施連動運作功能測試,將會同蘇花公路改善工程處進行消防設備功能測試驗證,基於測試作業將涵蓋隧道全斷面之消防水霧噴灑,為用路及測試作業安全,因此採行夜間實施隧道管制封閉措施。
 四工處提醒用路人事先作行程規劃,屆時若需行經封閉路段,請配合改道行駛台九丁線(舊蘇花公路)。

{ "slotId": "", "unitType": "responsive", "pubId": "pub-5179049803621131", "resize": "auto" }